Part of our guide to How to delegate work to AI agents: tasks, autonomy levels and review loops
On this page · 6 sections
Imagine a customer who asks for a second external light while the electrician is measuring the first location. The request sounds simple. The second location may involve different access, materials or labour. The customer might be asking for a price, giving approval to proceed or merely exploring an idea. Those are three distinct instructions. The office needs to know which one the customer actually gave.
Capture what changed while the original job is still visible
Find the accepted quote revision and the relevant line before dictating the new request. If the site worker cannot access the quote, capture the job reference and say the comparison remains pending. The assistant can prepare a useful note with that gap visible. A draft that silently assumes the original quote covered only one item could create a disagreement before the estimator even sees it.
Ask the site worker for observations they can stand behind. Where is the proposed work? What did the customer point to? Which measurement was taken and which was estimated? Who else needs to inspect the change? Leave advice about scope, pricing and contractual requirements to the appropriate qualified person for the job. The drafting process should preserve the information for that decision.
Give the estimator a before-and-after record
Sample internal instruction: “Job J24, accepted quote revision B. Customer asked for a price to add a second fitting at the rear entry. Photo and approximate location supplied. Cable route and part availability unconfirmed. Prepare a variation draft for the estimator. Keep the installation date and amount open. No customer communication until approved.”
| Field | Original record | Proposed change |
|---|---|---|
| Work item | One fitting at the agreed location | Customer requested a price for a second location |
| Measurement | As specified in revision B | Rear location estimated on site, confirmation required |
| Price and timing | Accepted base quote | Estimator to assess additional materials, labour and schedule |
| Authority | Existing acceptance applies to original work | Identify who can approve the new offer and customer acceptance |
Include a visible reference to the original quote even when the assistant can paste its contents into the draft. The person pricing the variation may need to inspect assumptions that did not make the summary. A link to the actual accepted revision is more useful than a generic folder containing several documents with similar names. Ask a second colleague to retrieve it using the handover alone.
Keep three amounts and two decisions apart
For the estimator, separate the amount already accepted, the incremental change and the proposed revised total. If a line is being replaced rather than added, show the deduction or substitution explicitly. Do the arithmetic in the business's normal quoting system and reconcile the value against the draft. An assistant can help organise the inputs, but the authorised estimator owns the commercial calculation.
Keep tax treatment and quote wording consistent with the established process for that job. Do not let a draft infer whether an amount includes GST from an unrelated previous quote. When a supplier price or lead time is outstanding, mark the item as pending and identify who will obtain it. A blank amount can be safer than an attractive estimate copied from the wrong job.
There are two decisions. First the business approves what it is willing to offer. Then the customer decides whether to accept it. Record the date, the revision and the person for each decision under your normal procedure. A tradesperson telling the office that a customer “sounds keen” may be valuable context for follow-up, but it does not establish acceptance of the priced variation.
Handle late changes without losing the old version
Test the case where the customer changes their mind after the estimator has priced the draft. They now want a different fitting or want to postpone the second location. Keep the previous draft and mark its status before preparing another. If both versions remain marked ready to send, somebody covering the desk can easily send the wrong one.
Ask the assistant for a short difference note: which item changed, which assumptions remain open and whether the previous offer ever reached the customer. A change made before dispatch is different from a revised offer replacing something already sent. The owner of the customer relationship needs that distinction to explain the update and answer questions later.
Use one job timeline for the decision. The field note can stay in the crew's usual channel, but the quote record should identify the current approved revision. If staff use Fulcrum Sessions to coordinate handovers, specify who owns the next step in the existing quote system. One person should be able to tell a cover dispatcher which version could be sent at the end of the day.
Run a rehearsal with a change that should stop
Give the office a fake variation with two deliberate gaps. Perhaps the wall measurement is approximate and the person requesting the job is a tenant while approval is normally sought from another party. Ask for a draft and inspect the status the workflow produces. It should name the missing information and the responsible person. A polished customer-facing quote is premature if nobody has checked either gap.
Then close just one gap. Confirm the measurement but leave authority unresolved. Check that the record keeps the second issue open. A single “reviewed” tick can hide several independent decisions. For jobs where missing authority or a changed price has real consequences, use separate fields that the office can inspect without listening to the whole site recording.
Judge the pilot on fewer repeat visits to retrieve information and fewer calls back to the tradesperson for facts already captured. Record the cases where the estimator still needs a technical judgement from site. Those calls are part of good work. The goal is to spare the site worker the avoidable interruptions while ensuring the person accountable for the offer has enough evidence to approve it.
For a job with several variations, ask dispatch to read back the reference and approval date of the one being scheduled. That final check helps prevent a later revision from reopening work the customer already declined.
Related guides: How to delegate work to AI agents: tasks, autonomy levels and review loops · Approval gates for AI agents: what needs a human OK, and how to make it fast · How to write instructions for AI agents (with a definition of done).
Frequently asked questions
How much detail belongs in the first note?
Include the job reference, the original quote if available, the customer's own request, the location and what remains unknown. This is enough for the estimator to decide whether further measurements or supplier information are needed.
Can we reuse wording from an earlier variation?
Use a reviewed template for structure, then check every item against the current job. Similar addresses, parts or customer names do not establish that the previous assumptions apply.
When can dispatch schedule the extra work?
Follow your business's approval and scheduling process. Give dispatch the accepted revision, any confirmed lead times and the person who authorised release. If acceptance or availability is still pending, keep the work in a proposed state.



